Chieftain vehicle launched bridge deployment

A vehicle could build a 23-meter bridge in three minutes

3 min

The British Chieftain bridge-laying vehicle carried a 23-meter bridge strong enough to support 54-ton loads. It could put the entire bridge into place in about three minutes.

Ti piace? C’è un intero feed di cose così. Sostituisci lo scroll vuoto con cose che vale la pena conoscere.
Scarica Hence gratis