Chieftain vehicle launched bridge deployment

A vehicle could build a 23-meter bridge in three minutes

3 min

The British Chieftain bridge-laying vehicle carried a 23-meter bridge strong enough to support 54-ton loads. It could put the entire bridge into place in about three minutes.

Like this? There’s a whole feed of it. Replace empty scrolling with things worth knowing.
Download Hence for free