Chieftain vehicle launched bridge deployment

A vehicle could build a 23-meter bridge in three minutes

3 min

The British Chieftain bridge-laying vehicle carried a 23-meter bridge strong enough to support 54-ton loads. It could put the entire bridge into place in about three minutes.

¿Te gusta? Hay todo un feed de cosas así. Cambia el scroll vacío por cosas que merecen la pena conocer.
Descargar Hence gratis